Article summary: For a newly completed HDB flat, report window concerns …
You have collected the keys to your BTO flat, and the renovation start date is approaching. There is a mark beside the living-room window, while a bedroom panel feels different during ordinary use. Before treating either concern as a reason to order new windows, report it through the new-flat rectification process.
For a newly completed HDB flat, keep that report separate from your renovation wish list. Ask the Building Service Centre (BSC) to verify the reported items, and coordinate any outstanding work with the renovation team before it changes the surrounding condition. A preferred replacement style is a different question from the condition handed over.

Put the two HDB timings in the right places
HDB’s guidance on defects in new flats states that newly completed flats have a one-year Defects Liability Period (DLP), starting from key collection. It also asks owners to report items within one month of collecting keys and before renovation begins, to avoid needing to investigate whether construction or renovation caused them.
Keep both timings visible in your plan. The reporting instruction does not describe a separate one-month DLP. This discussion concerns newly completed flats; buying an older resale flat does not start the same new-flat period again.
Describe the window without deciding the cause
Give each concern a room and location. A photograph showing the whole window, followed by a closer view of the visible mark, is easier to follow than several unlabelled close-ups. Record when you first noticed it and what happened during ordinary use. Say what remains uncertain instead of naming a failed component.
Make observations from a normal indoor position. Do not dismantle parts, lean outside or run an improvised water test to strengthen the report. If normal operation feels abnormal, avoid repeatedly reproducing it and ask for assessment. Reporting an item gives BSC something to inspect; it does not establish the cause or the outcome.
Arrange the BSC visit before changing the surroundings
Use the reporting details in your Welcome Kit or the kitchen-wall notice, or approach the precinct’s BSC. HDB describes a joint inspection to verify reported items and the assignment of rectification contractors. Keep your submitted report and the subsequent replies together so everyone can refer to the same locations.
Record the next agreed action for each item, including who will contact you and whether another visit is needed. An inspection appointment by itself does not mean the reported item has been accepted or rectified.
Tell your renovation coordinator which window areas remain under discussion. If cabinetry, painting or other work is due beside them, ask how access and the present condition will be preserved until the next agreed step. If the schedules overlap, seek a specific arrangement with BSC and the renovation team rather than assuming all renovation must stop or can proceed unchanged.
Keep a window order separate from rectification
A showroom visit for sliding window replacement can happen while these discussions continue. Explain to the supplier which existing items are awaiting BSC verification and which changes are simply your preferences. Do not let a renovation quotation quietly become an instruction to remove a window that still needs assessment.
When rectification is complete, attend the closing inspection arranged by BSC and note anything still unresolved. Our window handover document guide gives broader record-keeping context; your new-flat report should retain its own inspection and follow-up trail.
If a separate repair-or-replacement choice remains afterwards, our repair-or-replace guide addresses that assessment. First resolve the reported handover concern and its next step, then confirm any separately chosen renovation order with its own scope and responsibilities.